Emergency plan and treatment
News Source:   2018-12-07 15:45:22

1. Organization guarantee

   Under the project department, a special emergency support team is set up to establish internal and external communication mechanisms。The project manager personally directs and directs the daily work of the emergency support team and directly listens to various reports of the emergency support team。In the case of a designated emergency, a meeting will be convened, temporary institutions will be organized or people will go to the scene to deal with it until the emergency is lifted。The group leaders are responsible for the organization, implementation and implementation of emergency plan measures within their responsibilities。 

2. Basic emergency measures 

   In view of the typical risk factors that affect the normal operation of the business, the project department will be committed to prevention and control by taking measures such as "planning, analysis and improving the level of operation"。The actual occurrence of an emergency due to third party liability, force majeure factors, potential risk factors, etc,Will follow the pre-established contingency plan,"Immediate reporting, maintenance site, request support, replacement replacement, adjustment plan" and other measures,Disposal under the customer's confirmation or authorization,In necessity,The project department will temporarily change the division of labor mode,The project manager personally allocates resources,Eliminate or mitigate the adverse impact of an emergency on the customer。The project Department will also ensure that every staff member engaged in on-site operations is familiar with the contents of the emergency plan through training and the preparation of portable emergency plan prints, so as to take the most appropriate measures when an emergency occurs。 

3. Emergency plan 

   3.1 Sudden weather emergency plan: If the weather changes during the transportation operation, such as rain and snow, the goods are covered in time and anti-skid measures are taken on the vehicle to ensure the safe delivery of the goods to the designated place。

   3.2 Emergency plan for vehicle failure: Before transportation, notify the standby vehicle and maintenance personnel to stand by。If there is a fault in the transport vehicle, immediately arrange maintenance technicians to repair it。If it is determined that it cannot be repaired, the standby vehicle shall be called in time and emergency transportation measures shall be taken to ensure the delivery to the designated place within the shortest time;

   3.3 Road emergency construction emergency plan: the project department repeatedly reconnaissance the land and line through which the large equipment is transported, and confirm the road situation again the day before the equipment is shipped, and master the detailed information of the transport route。In spite of this, it is still difficult to completely avoid the traffic obstruction caused by the emergency excavation of the road。In such cases, the site manager should take remedial measures in time. If the project manager is more difficult, he will go to the site personally, coordinate internal and external resources, put forward the transportation route rectification plan in time, and complete the rectification of the construction road in the shortest possible time with the cooperation of the construction department to ensure the smooth passage of equipment transportation; 

   3.4 Road congestion emergency plan: in the process of equipment transportation encountered traffic jams;Obey the coordination and command of local traffic authorities and strengthen traffic control。In case of fairs or major gatherings, suggest changes in transportation plans or seek new routes to ensure smooth passage;

   3.5 Traffic accident emergency plan: when a traffic accident occurs in a transport vehicle,On-site personnel protect the accident site in time,And report to the project manager, business and insurance company,State the case,Actively coordinate the handling of traffic police departments,In necessity,Coordinate the traffic police department to "release before processing" under the premise of making good records;

   3.6. Emergency plan for hardening and loosening: In case of loosening due to objective reasons during transportation, the quality monitoring personnel and experts of the attendants carefully analyze the causes of loosening, re-specify a feasible reinforcement plan, and re-reinforce the large equipment;

   3.7. Emergency plan for cargo damage and cargo shortage: In case of cargo damage and cargo shortage in the process of unloading and loading and handover at the dock, assist the owner to obtain relevant certificates from commodity inspection and insurance companies to ensure the interests of the owner;

   3.8 Mechanical failure plan: when loading and unloading goods at the site, if the working machinery or tools fail, immediately organize maintenance personnel to repair, if the maintenance conditions are not available or can not be repaired, call standby machinery and tools to resume normal operation;

   3.9 Force majeure emergency plan: In the event of force majeure during the transportation process, first of all, the transportation equipment is placed in a relatively safe zone, properly kept, and all available conditions are used to inform the owner of the event and developments, and in accordance with the owner's authorization to carry out work。If the basic communication conditions are not available, the relevant records and equipment shall be kept well and the owner shall be contacted directly or the force majeure event shall be lifted。After the impact of force majeure is eliminated, the project department will continue to implement the transportation plan on the premise of ensuring the safety of equipment and transportation personnel if conditions are available to continue the transportation。